1. Baker, K. R. (1974). Introduction to Sequencing and Scheduling: John Wiley & Sons.
2. Baker, N., & Freeland, J. (1975). Recent Advances in R&D Benefit Measurement and Project Selection Methods. Management Science, 21(10), 1164-1175. [
DOI:10.1287/mnsc.21.10.1164]
3. Bellani, L., & Scervini, F. (2020). Heterogeneity in Preferences for Redistribution and Public Spending: A Cross-Country Analysis. European Journal of Political Economy, 63(1), 101890. [
DOI:10.1016/j.ejpoleco.2020.101890]
4. Gee, R. E. (1971). A Survey of Current Project Selection Practices. Research Management, 14(5), 38-45. [
DOI:10.1080/00345334.1971.11756084]
5. Ghasemy, M. R., arbabian, S., Moeeni, S., & Salimi, B. (2015). Analysis of the Distribution Assets Acquisition of Capital Budget in State of Iran (1379-1390). The Journal of Planning and Budgeting, 20(1), 37-66. [
http://jpbud.ir/article-1-1078-fa.html]
6. Hansen, L. P., & Singleton, K. J. (1982). Generalized Instrumental Variables Estimation of Nonlinear Rational Expectations Models. Econometrica: Journal of the Econometric Society, 50(5), 1269-1286. [
DOI:10.2307/1911873]
7. Kerr, G. N., Cullen, R., & Hughey, K. F. (2003). Environmental Budget Allocation: Public Preferences. Commerce Division, Discussion Paper No. 98.
8. Khorramshahgol, R., & Steiner, H. M. (1988). Resource Analysis in Project Evaluation: A Multicriteria Approach. Journal of the Operational Research Society, 39(9), 795-803. [
DOI:10.1057/jors.1988.139]
9. Klomp, J. (2020). Subsidizing Power. Scottish Journal of Political Economy, 67(3), 300-321. [
DOI:10.1111/sjpe.12235]
10. McFadden, D. (1975). The Revealed Preferences of a Government Bureaucracy: Theory. The Bell Journal of Economics, 6(2), 401-416. [
DOI:10.2307/3003236]
11. Mouter, N. (2021). Willingness to Allocate Public Budget and Participatory Value Evaluation. In Advances in Transport Policy and Planning (Vol. 7, pp. 83-102): Elsevier. [
DOI:10.1016/bs.atpp.2021.01.001]
12. Potrafke, N. (2011). Does Government Ideology Influence Budget Composition? Empirical Evidence from OECD Countries. Economics of Governance, 12(2), 101-134. [
DOI:10.1007/s10101-010-0092-9]
13. Suh, C.-K., Suh, E.-H., & Baek, K.-C. (1994). Prioritizing Telecommunications Technologies for Long-Range R&D Planning to the Year 2006. IEEE Transactions on Engineering Management, 41(3), 264-275. [
DOI:10.1109/17.310141]
14. Taylor III, B. W., Moore, L. J., & Clayton, E. R. (1982). R&D Project Selection and Manpower Allocation with Integer Nonlinear Goal Programming. Management Science, 28(10), 1149-1158. [
DOI:10.1287/mnsc.28.10.1149]
15. Tingley, K. M., & Liebman, J. S. (1984). A Goal Programming Example in Public Health Resource Allocation. Management Science, 30(3), 279-289. [
DOI:10.1287/mnsc.30.3.279]
16. Winkofsky, E., Mason, R., & Souder, W. (1980). R&D Budgeting and Project Selection: A Review of Practices and Models. In (pp. 183-197): Amsterdam: North-Holland.
17. Zahedi, F. (1986). The Analytic Hierarchy Process-A Survey of the Method and Its Applications. Interfaces, 16(4), 96-108. [
DOI:10.1287/inte.16.4.96]